Powerway Enterprises LLC

220 kV OHL Stringing (Sur IPP – Sur GSS)

Client: OETC
Main Contractor: SNCC
Scope of Work: Stringing Work Completed


Project Overview

This project involved the stringing of a 220 kV overhead transmission line connecting the Sur Independent Power Plant (IPP) to the Sur Grid Substation (GSS). The line plays a vital role in strengthening the power evacuation system, ensuring stable transmission of electricity from Sur IPP to the national grid.


Scope of Work Executed by Powerway

  • Conductor Stringing: Precision-controlled stringing of 220 kV conductors across multiple tower sections.

  • Specialized Equipment: Use of advanced tensioner and puller machines to maintain conductor sag and clearance.

  • Safety Compliance: Strict adherence to OETC safety standards during live grid operations.

  • Quality Control: Continuous monitoring of stringing parameters to ensure alignment and mechanical strength.


Key Challenges

  • Navigating diverse terrain around Sur’s coastal region.

  • Ensuring minimal disruption to ongoing power generation at Sur IPP.

  • Working within strict timelines to meet project delivery schedules.