Client: OETC
Main Contractor: Galfar
Scope of Work: De-stringing & Re-stringing Completed
Project Overview
This project involved the de-stringing and re-stringing of a 132 kV Overhead Line (OHL) at Ghala, Oman. The work required careful planning and execution since it involved handling existing live-line infrastructure while ensuring minimum disruption to power transmission.
Key Challenges
-
Maintaining operational safety while working close to energized systems.
-
Ensuring structural stability of towers during de-stringing operations.
-
Managing tight shutdown schedules provided by OETC.
-
Working in urban terrain with restricted work zones.
Our Approach
-
De-stringing:
-
Safe removal of existing conductors using specialized tensioner-pullers.
-
Coordinated shutdown procedures with OETC.
-
-
Re-stringing:
-
Installation of new conductors with precision equipment.
-
Maintaining sag and tension parameters to meet OETC standards.
-
Testing and inspection to confirm compliance before energization.
-
-
Safety & Compliance:
-
Strict adherence to OETC safety guidelines.
-
Skilled workforce with live-line and shutdown experience.
-
Outcome
The project was successfully completed within schedule while maintaining the highest standards of safety, quality, and reliability. This execution strengthened Powerway’s reputation as a trusted partner for complex transmission line maintenance and upgrade projects in Oman.