132 kV OHL Access Road & Stringing (Musandam)

Client: RAECO
Main Contractor: SNCC


Project Overview

This project involved the construction of access roads and stringing of 132 kV overhead transmission lines in the Musandam region of Oman. Musandam’s rugged mountainous terrain posed unique challenges, making access road development a critical part of the project’s success.


Scope of Work

  • Access Road Construction: Built durable and safe access routes through steep and rocky terrain to reach tower locations.

  • 132 kV Line Stringing: Performed precise conductor stringing using advanced equipment to ensure safety and reliability.

  • Safety Compliance: All works carried out in strict adherence to OETC and RAECO standards.


Challenges & Solutions

  • Difficult Terrain: Musandam’s sharp inclines and rocky surfaces made mobility tough. Our skilled team used specialized road-cutting and benching techniques.

  • Weather Impact: The coastal climate demanded robust planning for safety and material handling.

  • Precision Work: Advanced stringing equipment ensured conductor tensioning and sag were executed flawlessly despite terrain difficulties.


Outcome

  • Reliable 132 kV transmission line stringing successfully completed.

  • Permanent access roads built to support both construction and future maintenance activities.

  • Enhanced regional power infrastructure in Musandam, supporting local communities and industries.