132 kV OHL Foundation, Erection & Stringing (Mabellah)

The project executed by PWE was a comprehensive 132 KV overhead transmission line contract in the Mabellaha region for the client OETC. The main contractor for this project was TLS, who subcontracted the core construction work to PWE. PWE’s scope of work was extensive, covering the entire construction cycle from the ground up.

This began with the construction of the tower foundations, ensuring a stable base for the structures. Following this, their team was responsible for the precise erection of the transmission towers at the designated locations. Finally, PWE completed the project by stringing the electrical conductors across the erected towers. This end-to-end execution highlights PWE’s capability to manage multiple critical phases of a transmission line project. The work was performed adhering to OETC’s strict technical and safety standards. Successfully delivering such a full-scope project for a major client like OETC significantly enhanced PWE’s portfolio. Ultimately, this project stands as a strong testament to PWE’s expertise and reliability in the Omani power transmission sector.