Project Overview
This project involved the erection and stringing of a 132 kV overhead transmission line connecting Jahloot to Quriat, a critical link in strengthening Oman’s transmission grid. The scope included complete tower erection, conductor stringing, and associated works, ensuring reliable power supply to the region.
Scope of Work
-
Tower Erection: Installation of lattice towers with precision alignment and foundation checks.
-
Conductor Stringing: Stringing, sagging, and clipping of conductors using advanced tensioner and puller equipment.
-
Insulator & Hardware Installation: Fixing of insulator strings and line hardware according to OETC standards.
-
Testing & Commissioning Support: Ensured readiness of the line for integration into the live grid.
Key Highlights
-
Executed under challenging terrain conditions, requiring advanced equipment and skilled manpower.
-
Completed with strict adherence to safety standards and OETC specifications.
-
Enhanced the stability and reliability of the 132 kV transmission network in the Quriat region.