Client: OETC
Main Contractor: Majan Telecommunication
Project Overview
This project involved the replacement of Optical Ground Wire (OPGW) conductors along the Bu Ali – Al Kamil transmission line in Oman. OPGW is a critical component that combines the functions of a traditional ground wire with a high-capacity optical fiber for reliable communication and protection in the power grid.
Scope of Work
-
Careful removal of existing OPGW conductor without disrupting ongoing power transmission.
-
Installation of new OPGW cables along the transmission line route.
-
Splicing, termination, and testing of fiber optic links to ensure uninterrupted data communication.
-
Coordination with live-line operations to maintain safety and system stability.
Challenges & Solutions
-
Live Line Safety: Our experienced team worked under strict OETC safety guidelines to prevent risk during replacement on energized lines.
-
Fiber Integrity: Advanced splicing and OTDR testing ensured optimal performance of optical fibers with minimal signal loss.
-
Time Sensitivity: Replacement works were completed within tight deadlines to minimize disruption to transmission operations.
Outcome
-
Successful installation of high-quality OPGW conductors along the Bu Ali – Al Kamil line.
-
Enhanced communication and protection for OETC’s transmission network.
-
Project delivered on time, safely, and to international standards, reinforcing Powerway’s expertise in OPGW solutions.